StatusIntegrated waste system quoted; the contractors Zoomlion, Jekora Ventures and Zesta Environmental Solutions have been engaged or evaluated
Project periodNovember 2026 – December 2026
ThemeClean and Healthy Campus
Support this project

The need

Waste Management and Recycling

A dumpsite on campus and the lack of a formal waste system leave rubbish building up, which harms health, blocks drains and damages the campus environment.

Dumpsite against the boundary wall
Dumpsite against the boundary wall (October 2026)

Planned work

Project activities

  1. 01

    Clearing the dumpsite and surrounding ground

  2. 02

    Setting up regular waste collection

  3. 03

    Introducing sorting and recycling

  4. 04

    Linking the work to drainage improvements so that waste no longer blocks drains

Estimated cost

To be confirmed

Estimates will be confirmed through competitive bids.

Funding type

One-off clearance plus recurring running cost

Who benefits
All students and staff, and neighbouring communities

Visual impact

Photographs to document: The dumpsite; rubbish around buildings; blocked drains.

Project funding

Funding progress

GoalGHS 133,949RaisedGHS 0Left to raiseGHS 133,949Supporters0

0% funded