The need
Drainage and Flood Protection
The campus floods during heavy rain and its soil is degraded. Flooding affects access, damages buildings and limits where new facilities can safely be built.
Planned work
Project activities
- 01
Commissioning a drainage and sanitation consultancy, proposed by Sewerage Systems Ghana Ltd
- 02
Mapping flood paths and low points
- 03
Setting safe building levels for new facilities
- 04
Coordinating the drainage design with the campus masterplan
Estimated cost
To be confirmed
Estimates will be confirmed through competitive bids.
Funding type
One-off capital
Who benefits
Everyone on campus; new classrooms and dormitories depend on it
Visual impact
Project Gallery
Photographs to document: Flooded ground; standing water; eroded paths; drains.
Project funding
The Ghana-cedi funding target and amount left to raise will be shown when confirmed.